Large span structural steel frame building or simple adaptation of buildings within existing waste transfer facilities (50,000 sq.ft).
Automatic odour and climate control – forced air cooling.
High level insulation, to reduce heat and noise emissions.
Automated waste reception and post treatment sanitized recyclables export/ re-use areas.
Self contained offices.
Utilitarian facility with modular expansion capability as waste volumes inevitably continue to grow.
To create cellulose biomass fibre Re3 is using an advanced autoclave process called the Wilson System, designed by Tom Wilson of TWS (Environmental Ireland) Ltd.